This is an HTML version of an attachment to the Official Information request 'Plans impacting commerce building'.







2400
5840
G.LB01 Entry
15
14
13
12
Lobby
11 10
9
8
7
6
5
4
3
2
1
6.10b
NORTH
L
DEMOLITION SELECTIONS
DEMOLITION SELECTIONS
DEMOLITION SELECTIONS
DEMOLITION SELECTIONS
2.22
.22 Cut Back existing safefy rail and make good ready to receive new rail.
F. Toilet
2.D01
.1 Uplift all existing carpet tiles as required on L02 and area of work on L03 and
.15 Allow to remove existing smoke curtains from L02, making good to allow for new
Duct
store on site ready to assess and reuse.
.8 Remove existing linings off of one side of the existing steel studs, making good
full height glazing.
ready to receive new linings.
3570
Remove all existing ceiling tiles and grid system from L02 and to selected areas
Allow to form new opening in existing interior steel stud wall and/or exterior
.23 Remove existing plasterboard ceilings as required to install new mechanical
.2 in L03. Retain existing blind recesses against the existing exterior windows and
walls, allow to remove linings to install new trimmers and lintel. Allow to patch
services.
glass block walls.
.9 Remove existing fibre cement sheet linings off of existing wall. Allow to patch as
required and restore to min. level 4 finish.
.16 interior as required and restore to min. level 4 finish. Trim out exterior opening
2.23
with flashings as required.
M. Toilet
.24 Remove existing plumbing fittings, joinery units etc as required and cap. - Refer
Hydraulic Documents.
K
.3 Remove existing plasterboard and Steel stud walls making good to the exterior
and interior walls as required.
.10 Remove existing glazing from flush glazed window and cut out section of sill and
make good ready for new mullions, glazing and door.
.17 Remove existing sash from window frame making good ready to receive noew
mechanical louvre and aluminium sheet panel.
.25 Remove all existing LED light fittings and returnm to the university. - Refer
Electrical Documents.
2.19
.4 Remove all nominated existing doors and frames on L02 and area of work on
Remove existing ceiling tiles as required and store on site for access to the
Conference Room
L03, retaining door leaves for reuse.
.11 ceiling space to install new plumbing for toilets. Allow to replace at the
completion of the works.
.18 Allow to make new openings in existing membrane roof for mechanical services
and structure.
.26 Remove all existing power outlets and light switches retaining wires as required
for future circuits. - Refer Electrical Documents.
Remove existing Vinyl wallpaper from all plasterboard wall linings being retained
Existing wall to remain
Existing wall to remain
.5 on L02 and area of work on L03. Allow to patch as required and restore to min.
Linings to this wall to be 
level 4 finish.
.12 Allow to route new wires through existing plasterboard walls and ceilings making
good at completion of work. Contractor to confirm extent.
.19 Make new openings in existing concrete floor system and new chases for
additional structure. - Refer Structural documents
removed from one side to allow 
.27 Remove all data outlets retaining all data cables for possible future reuse. -
Refer Electrical Documents.
7200
for installation of insulation
.7
Remove existing all vinyl skirting from all walls L02 and L03 in area of work.
2.24
.6 Making good to the plaster board walls as required and restore to min. level 4
.13 Allow to remove existing interior window. Allow to patch as required and restore
.20 Make new openings in existing copper tray façade and plywood sarking. - Refer
Mechanical for sizes and locations.
Office
to min. level 4 finish.
finish.
.28 Remove all heating after hours buttons and circuits. - Refer Mechanical and
Electrical Documents.
.7
.21 Remove existing access ladder and make good to membrane roofing
FHR
.7 Remove existing wall partition along with linings, skirtings, finishes etc. and
.14 Allow to remove all interior ACM ceiling panels and support structure as required
to L02.
make good to existing plasterboard remaining.
.29 Remove existing fire hose reel. Confirm reuse with Active Fire Protection sub
contractor.
.8
Remove existing concrete pavers, excavate for new foundations and reinstate
2.C04
2.25
existing pavers at completion around new structure. Refer Structural
J
.30
Corridor
Office
Documents.
Existing steel studs 
and lining to one 
side to remain.
2.26
.8
.8
Office
2.17
.2
.2
.2
.2
.2
Server
.13
Existing steel studs 
.16
4400
and lining to one 
2.27
2.28
2.29
2.30
side to remain.
.4
Seminar Room
Seminar Room
Seminar Room
Seminar Room
2.31
2.18
.1
Seminar Room
2.D07
Office
FSI Duct
.9
FHR
I
.7
Existing wall to remain
Existing glass block 
Existing glass block 
Existing glass block 
Existing glass block 
600
Remove fibre cement 
walls to remain
walls to remain
walls to remain
walls to remain
Existing glass block 
and make good
walls to remain
H
2.S04
Stairs
.6
.14
.1
2.C03
2400
2.21
Glass and smoke curtain removed, 
Corridor
.16
Store
.4
.15
Fulll height glazing installed.
.15
.14
FHR
G
2.D06
s/b
Duct
Existing stair, finishes and ceilings 
to remain
Existing wall to remain
2.16
2.33
2.32
Office
Office
Office
2.S02
5000
Stairs
.7
.4
.4
Linings to this wall to be 
F
removed from one side to allow 
2.14
for installation of insulation
2.35
.1
HR Office
2.34
.7
2.15
Office
.7
Office .1
Office
.6
2200
.7
.4
.4
.4
.4
E
.1
.6
.1
.7
.1
.7
.7
.2
.1
.2
.6
2.12
.7
2.37
2.36
3600
Office
Office
Office
2.13
Office
2.*V01
.7
Void
.4
.4
.7
.7
.4
.4
D
2.C02 Corridor
.4
.4
.4
.4
2.39
2.38
.1
2.10
2.11
Office
Office
Office
.1
Office
.6
.7
.7
7200
.4
2.C05 Corridor
.4
.4
.4
.7
.7
.1
.1
.6 2.08
2.09
2.41
2.40
Office
Office
Office
.1
Office
Existing fire walls 
.17
Existing fire walls 
around stair to remain
.16
around stair to remain
C
2.S01
.16
.2
2.S03
Stairs
.23
Stairs
3000
.16
B
S/B
2.03a
Store
.16
.16
Existing fire walls 
2.45a
S/B
Existing steel studs 
Existing steel studs 
Existing steel studs 
Switch Room
Existing fire walls 
around stair to remain
and lining to one 
and lining to one 
and lining to one 
.7
.8
around stair to remain
side to remain.
2,950
side to remain.
2,940
side to remain.
2.42
3,750
office
2.07
.16
2.03
2.01
2.01a
.8
.8
2.57
2.51
2.49
2.47
Office
Photocopy
Office
Reception
Office
2.55
2.53
Office
Office
Office
Existing duct to remain
Office
Office
.7
.4
.7
.7
.7
2.D05
.7
.4
2.45
FHR
Photocopy
2.D04
Duct
.7
Duct
FSI
.4
2.42a
Office
.24
Existing duct to remain
.4
2.C01
Corridor
.4
.4
.4
2.C06
12400
Corridor
.7
.4
.29
.4
.7
.7
.4
.4
.7
.5
Linings to this wall to be 
.7
removed from one side 
to allow for installation of 
.6
.8
2.L01
.7
2.L02
insulation
Lift 1
2.43
Existing steel studs 
Lift 2
2.D03 Duct
2.02
2.54
2.52
2.50
2.48
2.46
2.44
Office
and lining to one 
2.LL01
2.05
M. Toilet
2.D02 Duct
2.56
Office
Office
Office
Office
Office
Office
Lift Lobby
side to remain.
.24
F. Toilet
2.06
Office
2.04
.24
.24
Office
Office
.24
2.56a
A
Cleaners
.24
PATHWAY AND ENGLISH LANGUAGE CENTRE
McCOYWI O
X N
L02 DEMOLITION PLAN
ARCHITECTS
scale
 1 : 100
project number
5878
242 Stuart St, PO Box 5456 DUNEDIN
B
Tender Issue
09.06.2023
A
Consent Issue
01.06.2023
AR-113
printed
T
 03 477 2030
12/06/2023 9:20:57 am
status
E
  [email address]
W
mccoywixon.co.nz
rev.
TENDER
B
no. revision
date